Feature #2563
Controller: prefer finish package first instead of downloading files from other packages
Status: | New | Start date: | 10/18/2010 | |
---|---|---|---|---|
Priority: | Normal | Due date: | ||
Assignee: | % Done: | 0% | ||
Category: | Controlling | |||
Target version: | 030 - Version > 2.xxx | |||
Resolution: |
Description
I have a premium account so
jdownloader does download multiple files if i set it to do so. Only if i
have lets say 2 packages in que and set multiple downloads to 5 and now
the first package is almost done, only 5 more files downloading i dowt
want the next package start downloading - even if it means that the
first package runs only 4, then 3, 2, 1 downloads simultaniously -
before the first package is completely finished.